20:10:39:25Pre-test
Section · Administrative Rules of South Dakota · View on sdlegislature.gov ↗
Rulemaking activity
- ARSD 20:10Noticed
- ARSD 20:10Effective
- ARSD 20:10Effective
documentation. All pre-test calibration requirements required by §§ 20:10:39:11, 20:10:39:12, and 20:10:39:13 shall be completed and documented. A drawing of the dairy shall be prepared by the qualified testing professional indicating: (1) The location of the buildings; (2) Secondary electrical service panels and secondary feeder systems serving cow contact areas; (3) Transformers and central distribution point; (4) Existing grounding electrodes, if known; (5) The location of all cow contact points to be tested; (6) All remote reference electrodes; and (7) All primary and secondary neutral test points used in conjunction with the remote reference electrodes. A list of planned test points shall be prepared by the qualified testing professional using the applicable form before beginning each test. Each test point shall be listed separately and a specific reference number is given to each planned test point.
Source: 42 SDR 174, effective June 21, 2016.