20:44:25:06Switch requirements.
Section · Administrative Rules of South Dakota · View on sdlegislature.gov ↗
The switch or switches installed in the cogeneration system as required by power supplier systems must be so arranged that only authorized persons have control of these switches. Authorized persons shall be designated by the power supplier system.
Source: 10 SDR 131, effective June 3, 1984; 12 SDR 151, 12 SDR 155, effective July 1, 1986; 20 SDR 222, effective July 6, 1994; transferred from § 20:44:12:06, August 12, 1994.