The operator of a proposed high energy use facility must apply for a conditional use permit from a county adjacent to the political subdivision in which the facility is located if: (1) The facility is located within one mile of the boundary of the adjacent county; and (2) The adjacent county has adopted zoning ordinances or a special zoning area. For purposes of this section, "high energy use facility" means one or more buildings located on a single parcel, or multiple contiguous parcels, with an anticipated combined utility demand plus facility generated power of twenty megawatts or more of average electrical power.